Commercial Roof Replacement in Atlanta, GA

When a commercial roof is past saving, Advanced Roofing & Paving replaces it with a new TPO, EPDM, built-up or metal system built for your building’s use and budget. We scope every replacement from inspection evidence, so you pay to replace what has failed, not a guess.

When It's Time to Replace Your Commercial Roof

Replacement is usually the better investment when:

If the damage is limited, commercial roof repair may buy you years. We will tell you which one the evidence supports.

Tear-Off or Recover?

# Full Tear-Off Recover (Overlay)
1 What happens All roofing and wet insulation removed down to the deck New insulation board and membrane installed over the existing roof
2 Best when Moisture is widespread, the deck needs repair, or two roofs already exist The existing roof is mostly dry and only one layer is in place
3 Deck inspection Full: every damaged section is visible and repaired Limited to test cuts and scan data
4 Disruption More noise, debris and dumpster space Faster and quieter
5 Cost Higher, because of removal and disposal Lower

Building codes generally do not allow a new roof over two existing roofs. Our tear-off work removes worn layers, insulation and damaged decking to create a sound base for the new system.

Could a Restoration Work Instead?

If the membrane is aging but mostly dry, a silicone roof coating system can extend its life at a fraction of the cost of replacement. Our FLIR infrared scan shows how much of the roof is wet. That number decides between restoration and replacement.

Roof Systems for Your Replacement

01

Reflective white single-ply for large flat roofs.

02

Rubber membrane for low-slope roofs.

03

Multiple plies for redundant protection.

04

Standing seam or panel systems for sloped commercial roofs.

Roofing professionals replacing a roof deck

How We Replace a Commercial Roof

Keeping Your Building Open During Replacement

Most commercial replacements happen while the building stays in use. We work in sections so the roof is sealed at the end of each day, coordinate dumpster placement and crane access with your team, and protect interior areas below the work zone.

What Your Replacement Proposal Should Include

Use this list to compare bids on equal terms:

Roof area measured, and whether the job is a tear-off or a recover

How much insulation will be replaced, and the evidence for it

Deck repair allowance 
and unit price

New system, membrane thickness and insulation value

Flashing, drains, edge metal and rooftop equipment details

Schedule, staging and cleanup responsibilities

Warranty type, length and who issues it

What Affects the Cost of Commercial Roof Replacement

Price depends on roof size, the number of existing layers, how much insulation is wet, deck condition, the system chosen, access and crane needs, and the number of penetrations and rooftop units. We provide a free written estimate after inspecting your roof rather than publishing a per-square-foot guess.

Pavement Problems We RepairRelated Commercial Roofing Services

Commercial Roof Repair

Fix isolated leaks while the roof is still sound.

Commercial Roof Inspection

Documented condition before you budget.

Infrared Roof Scan

Measure how much insulation is wet.

Roof Coatings and Restoration

A lower-cost alternative for dry roofs.

New Roof Installation

Roof systems for new construction.

Recent Replacement Project

Roofing professionals replacing a roof deck

Relevant Project/Case Study

building type

Client information needed

city

Client information needed

 square footage

Client information needed

old system to new system

Client information needed

tear-off or recover

Client information needed

schedule

Client information needed

Commercial Roof Replacement Across Metro Atlanta

We replace roofs on warehouses, offices, retail centers and industrial buildings throughout Metro Atlanta, with industrial projects in Dalton and Calhoun.

QUESTIONS

Commercial Roof Replacement FAQs

It depends on size, existing layers, wet insulation, deck condition, the new system and access. We give a free written estimate after inspection.

Sometimes. A recover works when the existing roof is mostly dry and only one layer is in place. Codes generally do not allow a third layer.

It depends on roof size, weather and the system. Your proposal includes a schedule.

In most cases, yes. We work in sections and seal the roof at the end of each day.

A tear-off is recommended when there is extensive moisture damage, structural deterioration or multiple failing layers.

Plan Your Roof Replacement With Evidence

Ready to make an informed decision about your roof? Contact us to schedule a professional inspection and get clear guidance on your roof  needs.